Maryland ADU
Contractors
All seven counties
Allowed, code 1-19

ADU rules in Frederick County

Frederick County has had an ADU rule for years, written into county code 1-19 by Bills 18-16 and 20-10. A homeowner in Urbana, New Market, Middletown or Thurmont can put the unit inside the house, on as an addition, inside an accessory structure, or as a stand alone building in the yard.

The county is also the one that says the sprinkler part out loud, on the permit sheet itself. This page gives you the rule, the permits in the order you meet them, the published cost ranges, and a licensed builder to call. We do not build. We connect you with a builder who already does ADUs in Frederick County.

Ordinance status

County code 1-19 (Bills 18-16 and 20-10)

In force

Section 1-19-8.212 allows a limited accessory dwelling unit of up to 1,000 square feet in the RC, A, R1, R3, R5, R8, R12, R16, VC and MXD zones by affidavit. An ADU over 1,000 square feet goes to the Board of Appeals as a special exception.

The Residential Building Permit Information sheet (revised September 1, 2025, fees only) lists four ADU types: within a single family dwelling, an addition, within an accessory structure, and a stand alone separate accessory structure.

The same sheet says a sprinkler fire suppression system application will be required for all accessory dwelling units within an accessory structure or built as an accessory structure on a single family lot.

Read in the Frederick County Residential Building Permit Information sheet (revised September 1, 2025) and the affidavit text of section 1-19-8.212, October 31 and November 1, 2026.

Rules and size caps

What Frederick allows

  • Size: a limited ADU is 1,000 square feet or less, approved by affidavit. Larger units need a special exception from the Board of Appeals.
  • One ADU per lot. The owner lives in the principal dwelling or in the ADU and files an annual statement with the Zoning Administrator.
  • Parking: at least one additional space for the ADU; on street parking counts.
  • Placement: not in the required front yard. An ADU in or as an accessory structure also meets the accessory structure limits in 1-19-8.240: footprint no more than half the principal dwelling footprint or 600 square feet, whichever is greater, with an R-1 exception up to 2,000 square feet on a lot of 20,000 square feet or more.
  • Who files: a Registered Homebuilder for a stand alone accessory structure (or the Affirmation of Landowner form when the owner will live in it); an MHIC contractor for the other types when the owner will not live in the ADU.
  • No short term rental of the ADU in the nature of an extended stay hotel or Airbnb.
Unit types

Detached, attached or basement

Detached

A stand alone separate accessory structure, or a unit inside an existing barn or garage. Both take the sprinkler fire suppression system application the county permit sheet names, and under the state code a new detached dwelling gets a full NFPA 13D system. Many county lots are on well and septic, which adds the Environmental Health review and a tank and pump for the sprinkler.

Attached

An addition to the house with its own entrance and kitchen. Inside a house with no sprinklers the state code treats it as an addition and does not force sprinklers; a house that already has sprinklers needs a separate sprinkler application for the new unit.

Basement

A unit within the single family dwelling. Ceiling height, a second way out and moisture decide it. The permit sheet is explicit: a principal dwelling with an existing sprinkler system needs a separate sprinkler application for the new ADU; an unsprinklered house does not.

Permit path

Permits in Frederick, in the order you meet them

  1. 1

    Zoning

    Zoning review against 1-19-8.212: the 1,000 square foot line, one per lot, owner residence, the extra parking space, and the accessory structure footprint limits. Under 1,000 square feet you file the Affidavit for Accessory Dwelling Units Not Exceeding 1000 Square Feet with the application; over it, the Board of Appeals first.

  2. 2

    Building permit

    A residential building permit through the Division of Permits and Inspections, with a plot plan showing property lines, the existing dwelling, the proposed construction, parking and the well and septic area. Fees are due at application, except impact fees and tap fees. The Certificate of Occupancy closes it out.

  3. 3

    Fire protection permit

    A sprinkler fire suppression system application for every ADU within or built as an accessory structure, and for any ADU added to a house that already has sprinklers.

  4. 4

    Health (well and septic lots)

    Well and septic lots, most of the county outside the municipalities, need Environmental Health to confirm the well and the septic system carry a second kitchen and bath. Moving a system more than five feet from the foundation takes a septic repair permit ($60), and a missed inspection carries a $75 reinspection fee.

  5. 5

    Utilities

    Public water lots: a tap or a new service sized for sprinkler flow on a detached unit. Well lots: a storage tank and booster pump at the unit. Electric is a sub panel or a second Potomac Edison meter.

The whole list, statewide, in the order a homeowner meets it:

ADU permit checklist
Cost in Frederick

What an ADU costs in Frederick County

No builder and no county page publishes a Frederick County specific ADU price. The ranges below are Maryland wide, from one named builder page. The 1,000 square foot affidavit line keeps most detached units mid range; a well lot pushes it back up with the tank, pump and health review.

TypePublished range
Detached new build$120,000 to $300,000 and up
Attached addition$100,000 to $250,000
Basement conversion$80,000 to $200,000
Garage conversion$75,000 to $150,000

Source for the table:

Clarksville Construction Services, "How much does it cost to build an ADU in Maryland"

County fees

County permit fees on top of construction. The current Fee Schedule (effective July 1, 2026) is a scanned table on the Permits and Inspections page, so we quote only the lines on the permit information sheet:

  • Fees are due at the time of application, with the exception of impact fees and tap fees.
  • Filing fees are non refundable; the fee to extend an application or permit is the minimum permit fee; a revision fee applies to every resubmission.
  • Health Department: a $75 reinspection fee when a well or septic inspection cannot be completed, and a $60 septic repair permit when the system moves more than five feet from the foundation.
  • Impact fees and tap fees are billed separately, and the state law waives the impact fee on an ADU under 750 square feet.

Source for the fees:

Frederick County Permits and Inspections (Fee Schedule effective July 1, 2026)

Sprinkler cost

A detached unit adds the NFPA 13D sprinkler system. On public water that runs about $1.35 to $1.60 per sprinklered square foot (Maryland Fire Sprinklers cost guide, marylandfiresprinklers.com/cost/). A well lot adds a storage tank and pump, priced on the same guide.

Statewide ranges and how the types compare:

ADU cost in Maryland
Fire sprinklers

The sprinkler question, answered once

Frederick County puts it on the permit sheet: a sprinkler fire suppression system application is required for all accessory dwelling units within an accessory structure or built as an accessory structure on a single family lot. The county cannot waive the state rule (Public Safety Article 12-504), and on a well lot the system needs its own tank and pump. Our sister company, Maryland Fire Sprinklers, designs, permits and installs them.

Get matched

A licensed builder for your Frederick lot

Send the address and the kind of unit. We check it against the Frederick rule and the sprinkler question, then connect you with a licensed Maryland builder who already does ADUs here.

14 builders on the list, seven counties, one person reads every form the same day.

Call (240) 261-0261